Dear xing

Shanghai Songjiang Rubber Expansion Joint is adopted for Guangzhou Metro Line 6 Project

Time:2023-4-11 Edit:2939789029@qq.com

Shanghai Songjiang Rubber Expansion Joint is adopted for Guangzhou Metro Line 6 Project.

In November 2015, Shanghai Songjiang won the bid for the Guangzhou Metro Line 6 Lot 1 subway project, which uses Shanghai Songjiang rubber expansion joint snd other  products. The following is the contract for Songjiang Group to purchase Shanghai Songjiang rubber expansion joint for the Guangzhou Metro Line 6 Lot 1 project!

1、 The scanned copy of Shanghai Songjiang Rubber Joint Contract about Shanghai Songjiang Rubber Expansion Joint is adopted for Guangzhou Metro Line 6 Project:

Shanghai Songjiang Rubber Expansion Joint is adopted for Guangzhou Metro Line 6 Project

Shanghai Songjiang Rubber Expansion Joint is adopted for Guangzhou Metro Line 6 Project

2、 Introduction to Shanghai Songjiang Rubber Expansion Joint is adopted for Guangzhou Metro Line 6 Project:

Shanghai Songjiang Rubber Expansion Joint is adopted for Guangzhou Metro Line 6 Project
Line 6 starts from Xunfenggang in Jinshazhou area to the west of Guangzhou. After crossing the North Ring Expressway, it goes southeast along the center of Jinshazhou Road, crosses the the Pearl River tributary with the Baisha River Bridge to the east of Shafeng Village, and connects to the top of the sand of Datansha Island. After that, the line turns due south, transfers from elevated to underground tunnel, and then goes south to Tanwei Station on the side of Shuangqiao Road to transfer with Line 5. After crossing the Guangmao Railway, the line crosses the the Pearl River tributary obliquely, and Ruyifang Station is set at Duobao Road within the scope of the old Guangzhou South Railway Station. The line goes south along Huangsha Avenue to Huangsha Station on Datong Road and transfers to Line 1. After that, the line follows 623 Road, passes through the Cultural Park, Renmin South Road, and arrives at Haizhu Square along Yide Road to transfer to Line 2. After bypassing the Guangzhou Liberation Monument, pass through Taikang Road, Wanfu Road, Yuexiu South Road, and then pass through a large area of buildings near Donghua South Road and Dashatou Road to reach East Lake Station.

3、Shanghai Songjiang Rubber Expansion Joint is adopted for Guangzhou Metro Line 6 Project and Other introductions:

Shanghai Songjiang Rubber Expansion Joint is adopted for Guangzhou Metro Line 6 Project

Shanghai Songjiang Rubber Expansion Joint is adopted for Guangzhou Metro Line 6 Project
The bid evaluation work for the Guangzhou Metro Marketing Materials AB Package Procurement Project (Project No.: JG2015-3012) has been completed, and the bid evaluation committee has recommended the bid winning candidate for this project after review. The information about the candidates for winning the bid is hereby publicized (from 00:00 on June 29, 2015 to 23:59 on July 1, 2015), as follows:

“The bidding documents of Guangzhou Marco Advertising Co., Ltd. were rejected during the bid acceptance process. The detailed reasons and basis are as follows: Failure to submit the bidding documents and abandonment of the bid. According to Article 54 of the Regulations for the Implementation of the Bidding Law of the People’s Republic of China, if the bidder or other interested parties have any objections to the contents of the publicity, they should submit them to the tenderee during the publicity period of the winning candidate.”. The tenderee shall give a written reply within 3 days from the date of receiving the objection. Before giving a reply, the bidding and tendering activities shall be suspended. “Those who still hold objections to the response of the tenderee shall, within 10 days from the date of receiving the response, submit a complaint to the bidding and tendering supervision department with the tenderee’s response and complaint form.”.

Related products:Corrosion resistance Carbon Steel EPDM Single sphere Non Metal Expansion Joint 


+86 13032112360 Send SMS